Large heat pumps for district heating

We help district heating companies mature, design and deliver projects with large heat pumps, storage tanks and integration with existing facilities. Technology, integration, operating conditions and economics are settled early, so the project stays on track.

Utilities electrifying heat

Typical work

  • Large heat pumps and e-boilers
  • Network hydraulics and temperatures
  • Feasibility and detailed design
Talk to an engineer

Your contacts

Kristian Fredslund

Lead Consultant

Jakob Junge Krogh

Consultant

How we help, phase by phase

Phase 1

From idea to a strong decision basis

Many utilities need new capacity before the key choices are made: technology, heat source, integration principle and the need for storage or flexibility.

At this stage it matters to find the opportunities and limits, so the project does not lock into a solution that later proves expensive, complex or hard to operate.

What we typically help with

  • Concept and system architecture
  • Assessment of heat sources, integration and flexibility
  • Decision basis before detailed design and tender
Phase 2

Turning the project into a concrete solution

Once the direction is set, the project must be described so it can be tendered, built and delivered at the right quality. Unclear requirements lead to misunderstandings and costly changes.

We build a technical basis where design, operation and economics line up, and where the plant is realistic to deliver and robust to run.

What we typically help with

  • Technical project and system design
  • Tender material and technical specifications
  • Evaluation and qualification of offered solutions
Phase 3

Making it work in operation, not only on paper

A good project loses value if the plant underperforms or is not properly integrated into daily operation.

Testing, quality assurance and ongoing optimisation protect the investment. We follow the solution through, so the design intent holds once the plant is part of daily operation.

What we typically help with

  • Testing, supervision and quality assurance
  • Verification of capacity and function
  • Operational analysis and optimisation after commissioning

Related insights

All insights

Optimal sizing of heat pumps and thermal storage for district heating

How large should the heat pump and tank be? A grid of sizes simulated against DK1 and DK2 prices and demand.

The impact of forecasts on heat pump optimisation in district heating

No forecasts versus 1-, 3- and 7-day rolling optimisation for a heat pump with thermal storage.

Heat pumps in Danish district heating

All 221 heat pump and geothermal units in Danish district heating, with heat source, capacity and seasonal COP.

Have a project we should look at?

Tell us about your plant or idea. An engineer will get back to you, usually within one working day.